Pages

Friday, 31 August 2012

August 25th Update


The railings are installed and stained. The glass is installed in the doors.

The flooring in the basement is installed.

Kitchen is getting final items installed, including venting for the stove.

Painting is finished in the foyer.

Pews are being upholstered.

Yard being excavated and post holes for the fencing.are being dug...







No comments:

Post a Comment