and the walls came down...
Starting at 8:00 this morning, 9 men made quick work of removing the two interior walls in the sanctuary.
2 14-yd bins were carefully packed by the end of the day, and a pile of rubble beside.
One wall down, one to go...
Breaking for lunch, then back at it...
Second wall coming down. There was also a false ceiling above the side rooms that was removed.
9 hours, 9 men, and 2 bins... Both walls down.
Rest up gentlemen, we have more walls scheduled to come down on Monday!